Table 1

Minimum sample sizes required for improvement projects based on observed and desired system performance

Observed system performance (%)Desired system performance
80%90%
9526140
9070Not applicable
85260180
80Not applicable50
7528028
708020
664515
602510
50126
40105
2055
  • The table shows the approximate sample size required to reject the null hypothesis that observed performance (from an audited sample) is consistent with the desired system performance, shown here as being either 80% or 90%. If you wish to calculate an exact p value for your audit or Plan–Do–Study–Act (PDSA) result, follow the steps in online supplementary appendix 1. If you wish to calculate the exact 95% CI for your audit or PDSA result, follow the steps in online supplementary appendix 2. The results shown here all use the conventional two-tailed p value of 0.05.