Quality Improvement in Surgery Combining Lean Improvement Methods with Teamwork Training: A Controlled Before-After Study

PLoS One. 2015 Sep 18;10(9):e0138490. doi: 10.1371/journal.pone.0138490. eCollection 2015.

Abstract

Background: To investigate the effectiveness of combining teamwork training and lean process improvement, two distinct approaches to improving surgical safety. We conducted a controlled interrupted time series study in a specialist UK Orthopaedic hospital incorporating a plastic surgery team (which received the intervention) and an Orthopaedic theatre team acting as a control.

Study design: We used a 3 month intervention with 3 months data collection period before and after it. A combined teamwork training and lean process improvement intervention was delivered by an experienced specialist team. Before and after the intervention we evaluated team non-technical skills using NOTECHS II, technical performance using the glitch rate and WHO checklist compliance using a simple 3 point scale. We recorded complication rate, readmission rate and length of hospital stay data for 6 months before and after the intervention.

Results: In the active group, but not the control group, full compliance with WHO Time Out (T/O) increased from 14 to 71% (p = 0.032), Sign Out attempt rate (S/O) increased from 0% to 50% (p<0.001) and Oxford NOTECHS II scores increased after the intervention (P = 0.058). Glitch rate decreased in the active group and increased in the control group (p = 0.001). Complications and length of stay appeared to rise in the control group and fall in the active group.

Conclusions: Combining teamwork training and systems improvement enhanced both technical and non-technical operating team process measures, and were associated with a trend to better safety outcome measures in a controlled study comparison. We suggest that approaches which address both system and culture dimensions of safety may prove valuable in reducing risks to patients.

Publication types

  • Research Support, Non-U.S. Gov't

MeSH terms

  • Clinical Competence / standards*
  • Controlled Before-After Studies
  • Humans
  • Length of Stay
  • Orthopedics / standards*
  • Patient Care Team*
  • Quality Improvement*
  • Surgery, Plastic / standards*

Grants and funding

This paper presents independent research funded by the National Institute for Health Research (NIHR) under its Programme Grants for Applied Research programme (Reference Number RP-PG-0108-10020). The views expressed are those of the authors and not necessarily those of the NHS, the NIHR or the Department of Health.