TableĀ 2

Summary of results

Preintervention
Active
Postintervention
Active
Preintervention
Control
Postintervention
Control
p Value*
NOTECHS Mean (SD)74.84 (7.43)73.79 (8.36)72.52 (9.09)72.88 (8.65)0.67
WHO time-out attempted24/25 (96%)25/29 (86%)22/25 (88%)23/26 (88%)0.25
WHO time-out satisfactory (%)11/24 (44)8/29 (28)14/25 (56)5/26 (19)0.28
WHO sign-out attempted0/25 (0%)2/29 (7%)0/25 (0%)1/26 (4%)0.85
Glitch rate/h4.75 (2.68)7.80 (4.79)4.92 (3.54)9.79 (4.12)0.24
90-day readmissions4 (1%)8 (2%)9 (1%)4 (1%)0.19
Complications17 (4%)35 (7%)61 (10%)79 (20%)0.32
Length of stay, days (SD)1.7 (4.3)1.8 (3.7)5.7 (8.4)5.4 (7.6)0.36
  • *p Value shows significance of difference in (before/after change) between active and control groups.

  • NOTECHS, Non-Technical Skills.